Period | Employing Organization | Country | Project assignment summery |
---|---|---|---|
August 2021 to Present | Client: Engineering and Planning Consultants/ Soil and Foundation Limited Hydro Morphology for 41 Bridges Funding Agency: Local Government Engineering Department | Bangladesh | Project: Hydrological and Morphological Study of 41 Bridges over Different River Responsible for establishing morphological characteristics of rivers, identification of erosion vulnerable area, river training considering environmental safeguard in Hydrological and Morphological Study of 41 Bridges over Different River |
August 2021 to Present | Client: JDI , New Vision Japan Sirajganj Economic Zone Funding Agency: Sirajganj Economic Zone Limited | Bangladesh | Consultancy service for the model, design, BOQ for water network, sewer, drainage, water and waste water treatment Design of drainage , sewer , water network. Modeling of local flooding and drainage design. Model and design of water and waste water treatment. Provide detail drawings and BOQ of the infrastructure |
August 2021 to Present | Client: Bangladesh Army 14th Brigade/ Cave Property Management Comilla University Funding Agency: Government of Bangladesh | Bangladesh | Consultancy service for the model, design, BOQ for water network, sewer, drainage, water and waste water treatment Design of drainage , sewer , water network. Modeling of local flooding and drainage design. Model and design of water and waste water treatment. Provide detail drawings and BOQ of the infrastructure |
May 2021-Present | Client: IIFC , Bangladesh Bridge Authority Funding Agency: PPP, Korea Anis Munsi SPMC | Bangladesh | Consultancy service for the transaction and review of the the Feasibility of Meghna Bridge PPP Hydraulic Morphological modeling and hydraulic design of the bridge, Detailed Hydraulic Report preparation. Review the design of the River Training Works |
January 2021-May 2021 | Employer: 14th Brigade Bangladesh Army, Funding Agency: Bangladesh Army | Bangladesh | Hydro Morphology study of two canals in Jalshiri Abashan Hydro Morphologic modeling and hydraulic design of the canals, Detailed Hydraulic Report preparation |
January 2021-May 2021 | Employer: Delight Engineers Limited, Funding Agency: Roads and Highway Department, Government of Bangladesh | Bangladesh | Hydro Morphology study of 890 m span bridge over river Dhalwesari on proposed Dhaka Middle Ring Road Hydro Morphologic modeling and hydraulic design of the bridge, Detailed Hydraulic Report preparation |
December 2019- May 2021 | Employer: Heptatech, Funding Agency: Narayanganj City Corporation, Government of Bangladesh | Bangladesh | Feasibility Study for 500MLD Surface Water Treatment Plant of Narayanganj City Corporation, 2000 Million BDT ensure the overall delivery of the project through examination of the background, objectives and contents of the project a Long Term Development Plan shall be proposed. And through justification of the possibility of the GoB fund and its effectiveness, technical and economic feasibility a Feasibility Study shall be conducted, |
January 2019-July 2020 | Client: Heptatech, Funding Agency: Narayanganj City Corporation, Government of Bangladesh | Bangladesh | Feasibility Study for 100 MLD Waste Water Treatment Plant of Narayanganj City Corporation, 1000 Million BDT ensure the overall delivery of the project through examination of the background, objectives and contents of the project a Long Term Development Plan shall be proposed. And through justification of the possibility of the GoB fund and its effectiveness, technical and economic feasibility a Feasibility Study shall be conducted, |
December 2019- January 2020 | Employer: SPMC, Bangladesh Funding Agency: World Bank, India Inland Water Transport Authority | Bangladesh | Consultancy service for implementation Jal Marg Vikas Project (JMVP) for capacity augmentation of navigation on National Waterway-1 (NW-1) , 5369 Crore Rupees Review the dredging plan Review the environmental management plan and healthy and safety |
July 2019 To Present | Employer: DDC Detail Design of Kewatkhali Bridge, Mymensingh Funding Agency: Asian Infrastructure Investment Bank Mahbubur Rahman | Bangladesh | Consultancy Services for Feasibility Study and Detailed Design for Construction of Kewatkhali Bridge over the river Brahmaputra at Mymensingh with Railway Overpass and 4-Lane Approach (including Service Road) Road Hydrologic modeling and hydraulic design of the bridge, Detailed Hydraulic Report preparation |
July 2019 To December 2019 | Employer: HDD China Detail Design of 360 m span bridge over Balu River on Madani Avenue connecting to Jalshiri Abashan Funding Agency: Roads and Highways Department | Bangladesh | Consultancy Services for Hydro Morphology Feasibility Study of Balu River Bridge Hydrologic modeling and hydraulic design of the bridge, Detailed Hydraulic Report preparation |
August 2019 To December 2019 | Employer: Asian Development Bank/DPHE Detail Design of Shalbagan Reservoir at Ukhia | Bangladesh | Project: TA 9546 BAN: Implementing the Emergency Assistance Project under Contract No. 151422-S26118 Hydraulic Modeling of Water Reservoir and detailed design |
January 2019 To February 2020 | Employer: Dhaka WASA North Water Supply Improvement Project, Funding Agency: Asian Development Bank, Project Value: 6500 Million BDT, Project Nature: Design Build | Bangladesh | Project: Dhaka North Water Supply Improvement Project, Funding Agency: Asian Development Bank, Project Value: 6500 Million BDT, Project Nature: Design Build Hydraulic Modeling of Piped Water Network. Commissioning of the network model |
August 2018 To June 2019 | Client Cardino/Local Government Engineering Department Funding Agency DFID | Bangladesh | LGED Pavement and Drainage Manual Development of the hydrology manual for providing guidance to LGED Engineers |
March 2018 To July 2018 | Employer: Designscape Limited Connecting Railway Project, Funding Agency: Bangladesh Rialway, GOB, Project Value: 8000 Million BDT | Bangladesh | Project: Mirasarai EZ Connecting Railway Project Design of vertical and horizontal alignment of 17 km of Railway track connecting Mirsharai Economic zone to Dhaka Chittagong Railway. Compute details of the earthwork and 3D modeling. Provide BOQ for the project |
August 2018 To December 2018 | Employer: Infrastructure Investment Facilitation Company New Railway Project, Funding Agency: GOB and Government of China, Project Value: 30000 Million BDT | Bangladesh | Project: Jamalpur Joydevpur New Railway Project, Funding Agency: GOB and Government of China, Project Value: 30000 Million BDT Hydrologic modelling and determination of flow at crossing. Determination of Standard High Water Level at the crossings Compute Scour |
March 2018 To July 2018 | Employer: Infrastructure Investment Facilitation Company Connecting Railway Project, Funding Agency: GOB, Project Value: 8000 Million BDT | Bangladesh | Project: Mirasarai EZ Connecting Railway Project, Funding Agency: GOB, Project Value: 8000 Million BDT Hydrologic modelling and determination of flow at crossing. Determination of Standard High Water Level at the crossings. Compute Scour |
September 2017 To February 2018 | Employer: Engineering and Planning Consultants Ltd | Bangladesh | Project: Hydrological and Morphological Study of 14 Bridges over Different River at Kishoreganj, Mymensingh, Jamalpur, Rajbari, Kushtia, Narayanganj, Tangail, and Gazipur Districts (Package No. CIB-S-58 and CIB-S-60) under LGED. Responsible forestablishing characteristics of rivers, identification of erosion vulnerable area, river training considering environmental safeguard in Hydrological and Morphological Study of 14 Bridges over Different River at Kishoreganj, Mymensingh, Jamalpur, Rajbari, Kushtia, Narayanganj, Tangail, and Gazipur Districts (Package No. CIB-S-58 and CIB-S-60) under LGED. |
June 2017 To July 2017 | Employer: Bangladesh Water Development Board | Bangladesh | Project: Climate Smart Agricultural Water Development Project Review current relevant policies, legislations, and procedures/practices of the Government of Bangladesh (GoB) for land acquisition and population displacement related infrastructure development and explain its implication to the proposed project; Review the National Water Policy 1999 and the Guidelines Participatory Water Management 2000 and the procedures of registration of the WMOs with the Chief Water Management within BWDB for formation of WMOs, their registration and functioning in the PSM system. |
May 2017 To July 2017 | Employer: AI Associates Ltd | Bangladesh | Project: Rangamati Tourism Development Project: Responsible for preparing Environmental Impact Assessment and Environmental Management Plans for various flood control projects. Responsible for reviewing Environmental Assessment and Environmental Management Plans for various Development projects. Responsible for reviewing Strategic Environmental Planning for municipalities |